- With the increase in the load limit for winter road, materials for the 3NE solar farm were shipped into the Fort Chipewyan community
- Ten truckloads of solar panels, ten truckloads of racking and screw piles for the foundations and two control buildings that house the inverters and electronics for the farm were transported on the winter road
- ATCO brought in their own materials for the batteries and controls for their plants which allowed them to receive power; this power was then incorporated into the electrical grid.